English Türkçe

Trusted for experience. Preferred for performance.

PROJELER

Supplying ,assembling and engaging of 2 units slurry pumps / 2011 / WARMAN


Explanation: 2 unit slurry pumps (working with low performance) that locates in turbine maintenance department of Orhaneli Power Plant which is one of the most important and strategical power plant of EUAS in Marmara region ,have operationalized(made ready for use) by changing with WARMAN slurry pumps and being rehabilitated with a supervisor.


Basın Ekspres Yolu Değirmenbahçe cad. Asena sk.No:5 Çobançeşme/Bahçelievler/İstanbul facebook facebook
E7 Enerji | ©2009 All rights reserved | www.e7enerji.com